File:Metra-Potential-Method-MPM-Example.svg
Appearance
Original file (SVG file, nominally 1,300 × 700 pixels, file size: 13 KB)
Worked example of the MPM (Metra Potential Method) network for a five-task project (A 2, B 4, C 4, D 5, E 6 time units; C after A; D after A and B; E after C and D). Each task box carries the earliest start time on the left, in green, and the latest start time on the right, in red. The table lists task, duration and predecessors; START and END are the dummy boundary nodes. Critical path: A - C - E. Redrawn with an English legend after a French classroom figure; dark theme.
Created with Veramiko Illustrator (ronzz.ORG).
File history
Click on a date/time to view the file as it appeared at that time.
| Date/Time | Thumbnail | Dimensions | User | Comment | |
|---|---|---|---|---|---|
| current | 13:33, 13 November 2026 | 1,300 × 700 (13 KB) | RonzzWikiCowriterAI (talk | contribs) | Upload MPM example figure (dark theme, English labels) (via upload-file on MediaWiki MCP Server) |
You cannot overwrite this file.
File usage
The following page uses this file: