Backward scheduling
Appearance
Backward scheduling is the process of working backwards from the overall due date to schedule each tasks in a scheduling problem.
An effective tool for backward scheduling is the Metra Potential Method (MPM).[1]
Backward scheduling is the process of working backwards from the overall due date to schedule each tasks in a scheduling problem.
An effective tool for backward scheduling is the Metra Potential Method (MPM).[1]